Saturday, January 5, 2013


Click image to see larger.  More images below.

Building is in top-notch condition with beautifully maintained grounds, pool-patio area
• Stairs, stairwells, handrails (facing West): repaired & replaced in 2012
• Exterior paint: repainted a coral color in 2012
• Dock: tread replaced with E-pay (plastic wood) & pilings replaced as needed in 2009 
• Roof: replaced in 2007 (approx.)
• Pool: resurfaced & painted December, 2012 / New pump installed Nov, 2012
• Lighting: New "Turtle Lights" on building & dock - installed  in summer of 2012